Non-value-Added Analysis

Toyota Production System (Lean Manufacturing)

8 Wastes of Lean: How to Eliminate Wastes Thoroughly【”The Lean Farm” Book Review】

This post explains the 8 Wastes of Lean. Addition to Toyota's 7 Wastes, The 8th Waste, ‘Employee's unused creativity’ wa...
02.26.2018
DMAIC Explanation

DMAIC: 4 Steps of the Improve Phase vol. 1 【Review the 1st half of Project】(Lean Six Sigma)

The Improve Phase consists of 4 steps. The first 2 steps, which are "1. Review all deliverables that were made through t...
04.17.2018
3. Templates Used in Analyze Phase

How to Conduct 7 Wastes +1 Analysis and Non-Value Analyis【Excel Template】 (Lean Six Sigma)

(Duration: 4:07) DOWNLOAD  ← Click this to download the "Value Stream Mapping" template file. << Related Posts >...
02.17.2018
Process Mapping / Process Analysis

Before making a flowchart, complete Value Stream Mapping (VSM) 【Toyota Production System】

(Duration: 4:42) DOWNLOAD  ← Click this to download the "Value Stream Mapping" template file. << Related Posts >...
02.28.2018
Toyota Production System (Lean Manufacturing)

Lean Six Sigma Version – The 7 (+1) Wastes = 【DOWNTIME】 (Toyota Production System)

(Duration: 4:02) << Related Videos >> Essence of Toyota's KAIZEN (Continuous Improvement): The 7 Wastes ...
02.17.2018
6. Templates Other Usage

Lean Six Sigma has to start from Voice of Customer: VOC 【Excel Template: VOC Matrix Diagram】

(Duration: 4:16) DOWNLOAD  ← Click this to download the "VOC Matrix Diagram" template file. << Related Videos >>...
02.17.2018
Sponsored Links
View My Stats